The ABG side of the bargain to get a major electricity
utility re-established in
Acting CEO of PNG Power, Tony Koiri, said the ABG had met
costs of K600,000 to enable PNG Power to return to
He said the money covered generators, staff housing and the
building of the Buka office.
The building was officially opened by the ABG Acting
President, Izekiel Massat.
This is fantastic news for all Bougainvillians.
Will PNG Power cover the ongoing operating costs?
Also, will the mainland of Bougainville Island and the outlying islands have "town" electricity, especially the area of Kieta / Arawa?
Posted by: paul ward | 15 September 2009 at 09:51 AM